18 May 2008

Nanometer cement (equipment of whole factory and enterprise planning investment planning) Outline;

Submitted by super

Nanometer cement (equipment of whole factory and enterprise planning investment planning) Outline;
----------------------------------------------------------------------------------------------------- -----------------------------------------------------------------------------------------------------
1. General cement raw materials is it support 3,000 lack of several 5% to need will it be one hour one day. Is it grind nanometer cement detailed degrees of 4u, total amount produce 3,000 tons to come.
2. Total hundred million 0 32 of exchange,etc. USD$7 a hundred million 8,130,000, NT$25 of capital cost, include the land, building, whole factory's equipment, circulating fund.
3. 45% of equipment of whole factory, 55% of circulating fund.
4. Main mechanical equipment full-automatic and platform scale pack NT$4 hundred million 0 32 of exchange,etc. USD$1, 2,500,000 yuan.
5. Perimeter relevant hundred million 25 million 32 of exchange,etc. USD$2, NT$7 of equipment, 2,660,000 yuan.
6. Include perimeter equipment not relevant (land, factory building, warehouse the room, office equipment, labware, hydroelectric project equipment, vapour boiler, transport vehicle of, piled machine not high of) And the investment planning fee of enterprise planning.
7. The whole area of land; 13,500 / square meter, area of factory building; 8,500 / square meter, office space; 1,350/ Square meter, warehouse room; 2,450 / square meter.
8. Total electric capacity; 3,500/ KW. Use the total water yield in one day; 12.5 / ton.
9. Raw materials fill a prescription; General cement, (whether in weight hundred million research and develop) Grind the auxiliary of difference in temperature.
10. The total number of person of producer and caretaker; 35 personnel.
11. Equipment of whole factory and enterprise planning investment planning are taken as amount of money 2.5% of the total capital cost.
12. It is amount of money 15% of the total capital cost that technology produces and researches and develops and fills a prescription to guide the tech stock.
------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------
*Equipment of whole factory and enterprise planning investment planning are taken as 2.5% of the items of amount of money of the total capital cost;
A, Russia invest in the item of offering of manufacturer;
1. Must offer temperature and climate form throughout the year.
2. Must offer the composition form of the raw material sources and purchase into factory's price list.
3. Nanometer cement detailed degrees of 4u may substitute the traditional industry a kind of high-accuracy cement, for instance; 1.Building coating surface material (trowel wraps the worker law) Waterproof, ventilative, the permanence is firm. 2.But low-temperature sintering of magnetism brick of high-pressure shaping. 3. High-pressure shaping does not need to frit.: 4.Add water and mix and irritate mould shaping application. 5.Cement sewage pipe top layer whitewashing low temperature frit magnetism brick (acidproof able to bear salt, better smooth and good densitying) Substitute the traditional epoxy resin and high polymer plastics and protect the membrane. The apt new era of construction with low costs result is developed, studied, promoted.

B, manufacturer must invest in the manufacturer and offer the above item according to Russia, must make detailed analytical table offer Russia invest in manufacturer make investment risk assess the basis.
1. Manufacturers invest in the manufacturer and offer the project of the materials according to Russia, study and develop samples in experiment.
2. Manufacturers invest in the manufacturer like signing cooperation with Russia, equipment of whole factory and enterprise planning investment planning are taken and must be sent and offered as a gift for such items as amount of money 2.5% of the total capital cost,etc., relevant personnel, for instance; The factory plans architect, mechanical engineering designer, hydroelectric project designer, manufacturers and investment manufacturer pair and discusses the plant designing planning of the scheme tightly.
3. Manufacturers must finish whole factory's planning the projects of both sides of the blueprint and discussing that there is not an suggestion within signing time limit of both sides, plant designing blueprint and water and electricity design blueprint transfer to Russia invest in manufacturer send bag all project and overseer to is it deal with but manufacturer help to confirm by oneself.
4. Manufacturer's main task takes a trial run and produces etc. filling a prescription and studying and is responsible for to mechanical equipment manufacturing and installation.
5. Produce and sell management and totally invested in the manufacturer to run with by oneself by Russia.

Manufacturers;

CHUNG YEH MACHINERY & HARDWARE CORP.

No.560 Tung Yi Rd”Chia Yi City, Taiwan,R.O.C.
Telephone; 05-2766925 Spread; 05-2772000 Mobile telephone; 0937572487
Get in touch with people; Lu spreads again
cy.nec@msa.hinet.net
2007/4/13