18 May 2008

The coloured glaze leaves tiles (equipment of whole factory and enterprise planning investment planning) Outline;

Submitted by super

The coloured glaze leaves tiles (equipment of whole factory and enterprise planning investment planning) Outline;
----------------------------------------------------------------------------------------------------- -----------------------------------------------------------------------------------------------------
1. Clay 350 use total amount is it calculate from coloured glaze to output of tile to come will it be one hour one day such as raw materials.
2. Total hundred million 50 million 32 of exchange,etc. Dr.eye: USD$4 a hundred million 2,190,000, NT$13 of capital cost, include the land, building, whole factory's equipment, circulating fund.
3. 30% of equipment of whole factory, 70% of circulating fund.
4. Main mechanical equipment full-automatic NT$2 hundred million 50 million 32 of exchange,etc. Dr.eye: ten thousand yuan of USD$781.
5. Perimeter relevant hundred million 55 million 32 of exchange,etc. Dr.eye: ten thousand yuan of USD$484, NT$1 of equipment.
6. It include perimeter equipment not relevant (land, factory building, warehouse the room, office equipment, labware, hydroelectric project equipment, vapour boiler, transport vehicle of, piled machine not high of) And the investment planning fee of enterprise planning.
7. The whole area of land; 16,500 / square meter, area of factory building; 3,600 / square meter, office space; 350/ Square meter, warehouse room; 1,650 / square meter.
8. Total electric capacity; 2,800 /KW. Use the total water yield in one day; 28 / ton.
9. Raw materials fill a prescription; Clay, in weight hundred million research and develop difference in temperature auxiliary.
10. Burn 370 degrees of high-temperature stoves for 12 hours.
11. In weight hundred million research and develop uranium material of difference in temperature paint 7u detailed degree.
12. The total number of person of producer and caretaker; 165 personnel.
13. Equipment of whole factory and enterprise planning investment planning are taken as amount of money 2.5% of the total capital cost.
14. It is amount of money 15% of the total capital cost that technology produces and researches and develops and fills a prescription to guide the tech stock.
------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------
*Equipment of whole factory and enterprise planning investment planning are taken as 2.5% of the items of amount of money of the total capital cost;

A, Russia invest in the item of offering of manufacturer;

1. Must offer temperature and climate form throughout the year.
2. Must offer the composition form of the raw material sources and purchase into factory's price list.
3. Investing in the manufacturer must offer products sample and Yi selling and manufacturing cost demand, let manufacturer make technological cost analysis and products grade make a reservation, is it invest in factory market competition and returns on investment interests analyse assess to cooperate.
4. Investing in the manufacturer must offer the coloured glaze to leave tiles, main needle field various kinds of coloured glaze, demand of design let from tile sample manufacturer can needle Yi a large amount of coloured glaze design mechanical automation and turn on the mould from the tile.

B, manufacturer must invest in the manufacturer and offer the above item according to Russia, must make detailed analytical table offer Russia invest in manufacturer make investment risk assess the basis.

1. Manufacturers invest in the manufacturer and offer the project of the materials according to Russia, study and develop samples in experiment.
2. Manufacturers invest in the manufacturer like signing cooperation with Russia, equipment of whole factory and enterprise planning investment planning are taken and must be sent and offered as a gift for such items as amount of money 2.5% of the total capital cost,etc., Dr.eye: relevant personnel, for instance; The factory plans architect, mechanical engineering designer, hydroelectric project designer, manufacturers and investment manufacturer pair and discusses the plant designing planning of the scheme tightly.
3. Manufacturers must finish whole factory's planning the projects of both sides of the blueprint and discussing that there is not an suggestion within signing time limit of both sides, plant designing blueprint and water and electricity design blueprint transfer to Russia invest in manufacturer send bag all project and overseer to is it deal with but manufacturer help to confirm by oneself.
4. Manufacturer's main task takes a trial run and produces etc. Dr.eye: filling a prescription and studying and is responsible for to mechanical equipment manufacturing and installation.
5. Produce and sell management and totally invested in the manufacturer to run with by oneself by Russia.

Manufacturers;

CHUNG YEH MACHINERY & HARDWARE CORP.
No.560 Tung Yi Rd”Chia Yi City, Taiwan,R.O.C.
Telephone; 05-2766925 Spread; 05-2772000 Mobile telephone; 0937572487
Get in touch with people; Lu spreads again
cy.nec@msa.hinet.net
2007/4/13