Calcium board of silicic acid (equipment of whole factory and enterprise planning investment planning) Outline;

Submitted by super

Calcium board of silicic acid (equipment of whole factory and enterprise planning investment planning) Outline;
------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------
1. Thickness 9mm width is 4 inches X8 inch / the 24-hour amount of production 4,350.

2. Total hundred million 25 million 32 of exchange,etc. Dr.eye: USD$5 a hundred million 7,030,000, NT$18 of capital cost, include the land, building, whole factory's equipment, circulating fund.
3. 40% of equipment of whole factory, 60% of circulating fund.

4. Main mechanical equipment full-automatic NT$2 hundred million 53 million 32 of exchange,etc. Dr.eye: ten thousand yuan of USD$791.

5. Perimeter relevant hundred million 77 million 32 of exchange,etc. Dr.eye: USD$1, NT$4 of equipment, 4,900,000 yuan.

6. The relevant equipment of perimeter include (Land, factory building, warehouse room, office equipment, labware, cook and protect the beautiful dragon one, steel fracture Zhyuan type machine, live foam cement transport person who form a vesicle, on-the-spot construction equipment tool, hydroelectric project equipment, vapour boiler, transport the vehicle, pile the high machine) And the investment planning fee of enterprise planning.

7. The whole area of land; 14,300 / square meter, area of factory building; 3,600 / square meter, office space; 130/ Square meter, warehouse room; 4,500 / square meter.

8. Total electric capacity; 3,600/KW. Use the total water yield in one day; 42 / ton.

9. Raw materials fill a prescription; Cement, silicic acid calcium stone, the fibre, such as (corn, timber bits) , hundred million researches and develops the auxiliary of difference in temperature again.

10. The total number of person of producer and caretaker; 42 personnel.

11. Equipment of whole factory and enterprise planning investment planning are taken as amount of money 2.5% of the total capital cost.

12. It is amount of money 15% of the total capital cost that technology produces and researches and develops and fills a prescription to guide the tech stock.
------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------
*Equipment of whole factory and enterprise planning investment planning are taken as 2.5% of the items of amount of money of the total capital cost;

A, Russia invest in the item of offering of manufacturer;

1. Must offer temperature and climate form throughout the year.
2. Must offer the composition form of the raw material sources and purchase into factory's price list.

3. Investing in the manufacturer must offer products sample and Yi selling and manufacturing cost demand, let manufacturer make technological cost analysis and products grade make a reservation, is it invest in factory market competition and returns on investment interests analyse assess to cooperate.

4. Must offer a national building decree to Russia to standardize the standard to invest in the manufacturer through a wall, for instance; Fire prevention, be waterproof, prevent frostbite and is able to bear knocking into the grade.

B, manufacturer must invest in the manufacturer and offer the above item according to Russia, must make detailed analytical table offer Russia invest in manufacturer make investment risk assess the basis.

1. Manufacturers invest in the manufacturer and offer the project of the materials according to Russia, study and develop samples in experiment.

2. Manufacturers invest in the manufacturer like signing cooperation with Russia, equipment of whole factory and enterprise planning investment planning are taken and must be sent and offered as a gift for such items as amount of money 2.5% of the total capital cost,etc., Dr.eye: relevant personnel, for instance; The factory plans architect, mechanical engineering designer, hydroelectric project designer, manufacturers and investment manufacturer pair and discusses the plant designing planning of the scheme tightly.
3. Manufacturers must finish whole factory's planning the projects of both sides of the blueprint and discussing that there is not an suggestion within signing time limit of both sides, plant designing blueprint and water and electricity design blueprint transfer to Russia invest in manufacturer send bag all project and overseer to is it deal with but manufacturer help to confirm by oneself.

4. Manufacturer's main task takes a trial run and produces etc. Dr.eye: filling a prescription and studying and is responsible for to mechanical equipment manufacturing and installation.
5. Produce and sell management and totally invested in the manufacturer to run with by oneself by Russia.
Manufacturers;

CHUNG YEH MACHINERY & HARDWARE CORP.

No.560 Tung Yi Rd”Chia Yi City, Taiwan,R.O.C.
Telephone; 05-2766925 Spread; 05-2772000 Mobile telephone; 0937572487
Get in touch with people; Lu spreads again
cy.nec@msa.hinet.net
2007/4/13