Weave cotton cloth environmental protection paper experiment each Zhong 50 meters, 600mmX of production equipment
Name of an article of the equipment, specification, structure, function;

1. There is no axis oil pressure type to adjust automatically independently (put and draw back a circle) 2 machines.
a.
Weave cotton cloth rolls of specification of enclosing; Pass wide 600mm of 1000mmX directly.
b.
Oil pressure pump Pu motor 2HP, exchange the servo motor 2HP.
c.
PC procedure computer sets up and automaticallies control (adjust and cooperate with moving and adjusting in succession independently) .
d.
The automatic fine setting wheel of the oil pressure presses the function equipment.

2. The independent spiral type hoists or lower 2 storing machines.
a.
Concave cam shelf wide 600mm of 50 to 70 meters of X from head to foot.
b.
Oil pressure pump pairs of oil anus, 1HP of motor, Pu.
c.
Exchange the servo motor 2HP in spiral.
d.
The double round is exchanged the servo motor 1HP draws the wheel.
e.
PC procedure computer sets up and automaticallies control (adjust and cooperate with moving and adjusting in succession independently) .
f.
The automatic fine setting wheel of the oil pressure presses the function equipment.
3
The tricycle is flattenned and the double round press one membrane scribbling machine.
a.
Diam
One pair of functions get the material ready and apply the membrane in two-seater ship with membrane trough.
c.
Oil pressure pump Pu motor 2HP, exchange the servo motor 5HP.
d.
PC procedure computer sets up and automaticallies control (adjust and cooperate with moving and adjusting in succession independently) .
e.
The automatic fine setting wheel of the oil pressure presses the function equipment.
4.
4.The tricycle flattens and shaves 2 membrane scribbling machines.
a.
Diameter rounds of 200mmX wide 600mm.
b.
The single trough activity suppresses and shaves and applies the membrane trough.
c.
Oil pressure pump Pu motor 2HP, exchange the servo motor 3HP.
d.
The automatic fine setting wheel of the oil pressure presses the function equipment.
e.
PC procedure computer sets up and automaticallies control (adjust and cooperate with moving and adjusting in succession independently) .
f.
The automatic fine setting wheel of the oil pressure presses the function equipment.

5. Double round flatten and two-seater pairs of power polishing machine one.
a.
Diameter rounds of 200mmX wide 600mm.
b.
The double round flattens and joins the wheel to polish and drive and exchange the servo motor badly specifically.
c.
Oil pressure pump Pu motor 3HP, exchange servo each, 5HP of motor, organize 10HP altogether specifically.
g.
The automatic fine setting wheel of the oil pressure presses the function equipment.
d.
PC procedure computer sets up and automaticallies control (adjust and cooperate with moving and adjusting in succession independently) .
e.
The automatic fine setting wheel of the oil pressure presses the function equipment.

6.Automatically controlled PC procedure computer sets up and automaticallies control the electric equipment (adjust and cooperate with moving and adjusting in succession independently) The total panel silver looks at and shows and communicates and touches and designs the function specifically (the attenbant two people) .

7. Peripheral batching mix barrel trough 304 material group 200kg.
a.
Enclose 5HP frequency converter have section change speed and not automatic peng, pounds of 1HP pump Pu (batching person 1 people) .
8.
8. Ling but water trough 1 of tower enclose 5 following Ling icing machine 3HP.
9.
9.Necessary motive force is one horsepower of total amount (73 horsepowers) .
10.
10.Dry total amount of purple other light of necessary electric heat energy (100HP electricity) .

Remarks;

1.This quotation sheet has not included and sent technical staff's traffic, board and
lodging and machinery for buyer's factory according to loading with and trying the
fare to use. If the buyer needs sellers to send personnel to go on according to
installing and taking a trial run to buyer's factory, then buyer last personnel Return to
ticket, board and lodging, local transportation fares, is it send personnel wages one
every day dollars of US$150 yuan to pay Whole.

2. New Taiwan dollar $ of total price? Enclose the condition of the fund; Contract 50% deposit send a telegraphic remittance new Taiwan dollar $? And Taiwan serious a hundred million industrial manufacturer of Limited Company take place and charter assembling (finish in 180 days) ,Require Taiwan five shut quality formate Limited Company technical staff Yi operate on a small quantity is it repair software and hardware technology is it operate Engineer can the skill jointly to fill a prescription to test-manufacturing now (finish in 30 days) Need to offer the experiment to test-manufacture samples and cost calculation materials in a small amount, for Malaysia to invest in the manufacturer (specially shut The company) Approve, the first 40% of the new Taiwan dollar $ goods appear in the conductance? A whole set of aircrew cases manufacturer's disassembly and assembly (10 days) Produce goods FOB and arrive at the Malaysian quay (10 days) Invested in the manufacturer and got the goods and gone on according to installing and taken a trial run to the factory (30 days) Five shuts the quality and formates the technical staff of the Limited Company now Yi is finished from Taiwan. Wire the end fund 10% of the new Taiwan dollar $? Is it finish normal production progress work 260 days such as heaven to need always.

訂購廠商 ; 由馬來西亞投資廠(特合 公司)
出貨廠商 ; 由台灣五合質合成股份有限公司
製造廠商 ; 由台灣重億興業股份有限公司